TelcoNews UK - Telecommunications news for ICT decision-makers
United Kingdom
Airsys launches Arc90 to boost data centre compute power

Airsys launches Arc90 to boost data centre compute power

Thu, 19th Nov 2026 (Today)
Sofiah Nichole Salivio
SOFIAH NICHOLE SALIVIO News Editor

Airsys has launched Arc90, a thermal management architecture for data centres designed around a Power Compute Effectiveness target of up to 0.90.

Arc90 is intended to change how Airsys scopes, validates and prices projects by treating thermal management as an integrated design outcome rather than a list of individual products. The approach combines air, liquid and hybrid cooling within one architecture and aims to direct a larger share of a facility's provisioned electrical capacity to IT compute.

At the centre of the framework is Power Compute Effectiveness, or PCE, a metric developed by Airsys to measure how much of a site's provisioned electrical capacity is allocated to compute rather than cooling, electrical losses and other support loads. The metric is based on provisioned values in design documentation, rather than operational performance once a facility is running.

A PCE of 0.90 means 90 MW of every 100 MW of provisioned capacity would be allocated to IT compute, with the remaining 10 MW assigned to supporting infrastructure. Airsys said many existing designs are closer to 0.70, leaving about 30% of provisioned capacity assigned to overhead before servers are installed.

Airsys is positioning the architecture as a response to tighter power availability for new data centre developments, particularly as AI workloads increase demand for dense compute infrastructure. It argues that design decisions made before construction determine how much of a site's electrical capacity is available for computing.

"The race to build AI infrastructure is now a race for power," said Yunshui Chen, Founder and Chief Executive Officer of Airsys. "The choices made before construction begins decide how much of that power is ever set aside for compute. Arc90 is how we intend to answer that question with our customers from the first drawing: one architecture, designed and priced around the outcome rather than a list of equipment."

How it works

Arc90 uses three separate thermal loops matched to different loads. A high-temperature liquid loop would serve CPUs and GPUs, a medium-temperature loop would handle residual air-side heat, and a low-temperature zone would cool electrical rooms, UPS areas and support spaces.

By separating those functions, chillers would need to be sized only for residual air-side heat rather than the full IT load. In its design modelling, Airsys said this can reduce required chiller capacity by up to 80% compared with a chiller-only design.

Arc90 is also designed to meet a zero evaporative water use target. That would reduce dependence on water-intensive cooling methods at a time when local communities and developers are paying closer attention to the environmental footprint of new data centre projects.

In a model for a hypothetical 60 MW facility in the south-eastern United States, Airsys said a chillers-only design produced a PCE of 0.74, while an Arc90 configuration targeted 0.90 under the same boundary and redundancy assumptions. That would leave about 22% more provisioned power available for compute within the same total facility capacity.

External analysts cited by Airsys said the concept reflects a broader industry shift from focusing only on operational efficiency to examining how electrical capacity is allocated at the design stage.

"In a power-constrained data center industry, every watt freed from physical infrastructure for AI computing is a win. PCE brings that priority into the design process, focusing on how much of a facility's provisioned power is available to IT rather than supporting infrastructure," said Vlad Galabov, Independent Data Centre Analyst and Host of The AIDC Debate. "Liquid cooling can help reduce cooling power demand, but capturing its full potential requires creative, whole-system thinking. Airsys is taking the right approach by treating cooling as a holistic challenge, addressing both new builds and retrofits of existing facilities."

Across product lines

Arc90 will become the thermal management architecture standard across five product lines: PowerOne for data centre thermal management, LiquidPack for retrofit liquid cooling, EdgeOne for modular and distributed sites, Aegis for chip- and component-level thermal management, and ComfortOne for commercial and education settings.

For existing air-cooled sites, Airsys plans to apply Arc90 principles through LiquidPack, the new name for its direct-to-server liquid spray cooling platform. The system is intended to convert servers already installed in air-cooled halls to single-phase liquid cooling and increase rack density within the existing footprint.

Airsys also said Aegis is developing a two-phase direct-to-chip cooling system built around a 3D-printed cold plate for higher-density processors. The design is intended to increase surface area for boiling coolant, guide vapour away from the chip and focus cooling on processor hotspots.

"With limited power availability and data center projects being so capital-intensive, the physical infrastructure goal is clear: deliver as much power as possible to compute in a reliable, efficient, and sustainable way," said Moises Levy, PhD, Chief Executive Officer and Founder of DCMETRIX, and a seasoned engineer and data center subject matter expert. "Arc90 brings that vision to the design or retrofit phase, helping organizations get more value from every watt."

Rand Talib, Research Analyst at Uptime Institute, linked the issue to the economics of data centre expansion. "As power availability becomes a growing constraint on data center development, operators need to look beyond operational efficiency and consider how effectively they allocate their available electrical capacity," Talib said. "Decisions made during the design phase determine how much capacity is reserved for IT equipment versus supporting infrastructure, with important implications for future expansion, infrastructure investment, and operational flexibility."